- High Technology Park of Ugra

Brief description of the project the project
  • Direction of the project

    Instrument engineering and transport

  • Stage of the project

    Стадия роста (growth stage)

  • Required investments

    5 000 000 ₽

Individual Entrepreneur Aleksandr Kim

Direction of

  Instrument engineering and transport
Project media library

Back to the list