Predicative analytical system for electrical submersible pump unit in producing well - High Technology Park of Ugra

Predicative analytical system for electrical submersible pump unit in producing well

Brief description of the project the project

The project focuses on the implementation of a software application into production. Using this application the increase of interrepair time of electrical submersible pumps in producing wells can be achieved by 8-10 times compared with current average failure interval. To achieve the planned objective the actual information will be used from the operation station of assembly with a centrifugal pump and the telemetry system of extractive industries.

  • Direction of the project

    Information Technology

  • Required investments

    10 000 000 ₽

OOO "FINIST-M" (LLC)

Direction of

  Information Technology
Project media library

Back to the list